Entries by JES Supply Company

Sub Zero Concrete Repairs in the Summer?

How do you repair concrete when the temperature of the air and concrete are well below 0℉? At these temperatures you cannot use cementitious materials that require water. In the Las Vegas heat, we do not have to wait long for the FlexKit 5 material to cure. It will cure in as little as 15 minutes.

Restroom Floor Repairs – A Dirty Job Gone Right

Clark County Parks and Recreation Department in Nevada needed a material that they could place on the floors of the public restrooms of their outdoor parks. Over the years, several of the prefabricated restroom buildings had settled to the point that maintenance workers could no longer properly clean the restrooms.